Daily Camera (Boulder)

Cone Zones

-

Boulder

• Hill Hotel: Westbound Pleasant is open for local traffic from Broadway to the alley. The eastbound lane is closed for demolition of old buildings and waterline and new sewer work. Activity time is from 7 a.m. to 5 p.m. weekdays. Anticipate­d to end Jan. 31.

• 28th and Colorado protected intersecti­on improvemen­ts: One westbound vehicle lane on Colorado Ave. will be closed. Drivers will be directed to the other westbound lane that remains open. The westbound transit stop at 28th and Colorado will be closed; transit riders are directed to the transit stop at 30th and Colorado. The project is expected to last until May 31.

Longmont

• Firestone-longmont mobility hub: The Colorado Department of Transporta­tion is constructi­ng the Firestone-longmont Mobility Hub at the Interstate 25 and Colo. 119 interchang­e. Daytime work hours are expected from 7 a.m. to 7 p.m. Monday through Friday, with periodic overnight work. Motorists can expect periodic single-lane closures on Colo. 119 and I-25 and on- and off-ramp closures, as well as 11-foot lane restrictio­ns on the southbound I-25 on-ramp and the northbound offramp at Exit 240. From 7 p.m. to 5 a.m. Tuesday through Thursday, constructi­on crews will be realigning the southbound and northbound off-ramps. The Colorado Department of Transporta­tion will have temporary closures that impact the I-25 southbound and northbound off-ramps at Exit 240, at Colo. 119 and southbound I-25 main line. The project is expected to be completed by August.

• Longs Peak Avenue: Work on the Price Park Tank Replacemen­t Project is underway. This 18-month-long project is intended to improve water quality and service within the city. Eastbound and westbound lanes on Longs Peak Avenue now run next to each other along the south side of the road between Sunset Street and the entrance to the Sunset Golf Course. Access to Price Park is closed, and parking in the Sunset Golf Course and Pool parking lot will be limited until next spring. Recreation­al facilities — including Sunset Park, Sunset Pool and Sunset Golf Course — are expected to remain open during constructi­on. There is still two-way traffic, but the existing westbound lane is expected to remain closed, and the new traffic pattern to remain in place until the project is completed in the spring.

Boulder County

• Colo. 119/Boulder Canyon Drive and Fourmile Canyon Drive crosswalk

relocation: The crosswalk at the intersecti­on of Colo. 119/Boulder Canyon Drive and Fourmile Canyon Drive will be temporaril­y relocated approximat­ely 200 feet to the west so crews can make repairs to the concrete multiuse trail on the south side of Colo. 119. Access to the Boulder Canyon Path will remain in place. No closures of Boulder Canyon or Fourmile Canyon drives will be necessary. Working hours are from 8 a.m. to 4:30 p.m. Monday through Saturday.

Erie

• Irrigation ditch work on N. 119th Street: JOC Constructi­on will be converting an existing open channel irrigation ditch into a piped irrigation system on N. 119th Street near the Rex Ranch Developmen­t. Residents and drivers in the area should expect partial lane closures for the duration of the project, which was expected to be completed by the end of December (weather permitting).

• 119th Street and Erie Parkway: Extending until Dec. 31 (weather permitting), the Town of Erie Public Works Department will be optimizing and repairing concrete and asphalt at the roundabout located at the southeast corner of the intersecti­on of 119th Street and Erie Parkway.

• Colo. 7 and 119th Street: An intersecti­on improvemen­t project at Colo. 7 and 119th Street is officially underway, with an expected completion in late 2024. Residents will notice traffic control installati­ons guiding the flow as constructi­on teams dive into their tasks, including utility potholing and preparator­y earthwork operations. Concurrent­ly, various existing structures, such as fencing, will be removed to make room for the upgrades.

Mead

• Colo. 66 intersecti­on project: CDOT is working on an improvemen­t project on Colo. 66 in Mead at the intersecti­ons of Colo. 66 and WCR 7 and Colo. 66 and WCR 13 (Colorado Boulevard) The traffic signal systems will be replaced at both intersecti­ons. An asphalt overlay will be applied at the WCR 7 intersecti­on. Working hours are from 8 a.m. to 5 p.m. Monday through Friday and from 9 p.m. to 5 a.m. Sunday through Thursday nights. Work is expected to be completed in late March.

Newspapers in English

Newspapers from United States